|
||
School: SQUIRE Quest 1: Getting Ready for Winter |
Select 1 Report below Log In to Create a new Report or Modify your existing Reports |
Task E1: Electricity Due Date: 11/27/1998 |
Determine the voltage and KWH capacity of the battery set, as well as rated output of the inverter in the existing power supply system. Specify voltage and size of initial PV system. Can this be made compatible with the display system in the Mobile Education Station?
|
Reports posted for this Task: Status of our electrical system. by Alan H. |
Virtual Schoolhouse Technology Copyright © 1998-2005, EcoSage Corporation E-mail: webmaster@ecosage.com |